Home/Equipment Sourcing & Procurement

Service

Equipment Sourcing & Procurement

Most integrators buy through layers of distributors. Each layer adds margin, adds a hand-off and adds time. We work directly with the manufacturers, which changes both the price and the schedule.

Scope

Small components through to major assets.

One order can cover a pallet of line hardware and a 400 kV transformer. The commercial route is the same.

  • Power transformers: to 500 MVA, 400 kV class, including generator step-up and auto-transformers
  • Distribution transformers: pad-mount, pole-mount and submersible, 10 kVA to 12,500 kVA
  • Switchgear: GIS and AIS, medium-voltage switchgear, ring main units, MCCs
  • Circuit breakers: vacuum, SF6 and air, with reclosers and sectionalisers
  • Protection & control: digital relays, RTUs, panels, metering, CTs and PTs
  • Reactors & compensation: shunt and series reactors, capacitor banks, voltage regulators
  • Cable & accessories: MV/LV cable, terminations, splices, connectors and line hardware
  • Generation equipment: turbines, generators, BESS packages and inverter-duty transformers
  • Station equipment: surge arresters, earthing systems, insulators, structures and fittings
  • Data center power: MV switchgear and unit substations, cast-resin and dry-type transformers, busway, switchboards, PDUs, static transfer switches and standby generator sets
  • Packaged solutions: e-houses, skid-mounted and modular substations

The advantage

Factory-direct pricing with documented compliance.

AdvantageWhat it means for the buyer
Factory-direct pricingFewer intermediaries between the plant and the project, so a lower landed cost on everything from relays and cable to power transformers and GIS.
Volume aggregationDemand pooled across projects and clients, giving buying power that a single order could not achieve on its own.
Production slot accessLong-standing manufacturer relationships help secure manufacturing slots at exactly the point when published lead times are at their worst.
Multiple sourcesEvery package benchmarked across several approved US manufacturers. No dependence on a single supplier or production slot.
Total landed costPrice, freight, duty, tariff exposure, warranty terms and delivery date compared together, because the cheapest ex-works number is frequently not the cheapest package.
Quality assuranceSupplier audits, witnessed factory acceptance tests and third-party inspection before anything leaves the plant.
Compliance handlingBuy America and domestic-content assessment, UL/ANSI/IEEE conformity, and utility approved-vendor-list requirements addressed up front.
One source, both endsFasteners, relays and metering through to substation transformers, breakers and generators, on one purchase order.

Specification compliance

Quoted against your document, clause by clause.

Most utilities and data center operators issue their own technical specification. A quotation that does not answer it line by line is not comparable with one that does.

What we returnWhy it matters
Clause-by-clause compliance statementEach requirement in your specification marked comply, deviate or exception, rather than a blanket statement that the offer meets the spec.
Explicit deviation listWhere a manufacturer cannot meet a clause, it is written down before award, not discovered at factory acceptance testing.
Normalised offersEvery manufacturer quoting the same scope and the same inclusions, so the price comparison is real rather than an artefact of what each chose to leave out.
Queries raised earlyConflicts and ambiguities in the specification are raised before the enquiry goes out, because they are cheaper to resolve then than during production.
Approved-vendor alignmentWhere you hold an approved-vendor list, the enquiry goes only to manufacturers on it, or we tell you plainly that the scope cannot be met from that list.

Commercial models

How the procurement relationship is structured.

A

Project purchase

A defined equipment package for a single project, priced on total landed cost with a committed delivery window and inspection plan.

B

Framework agreement

Agreed pricing and lead times across a category for a fixed term, called off against releases as projects are sanctioned.

C

Vendor-managed inventory

We hold agreed stock levels of critical items against your forecast, with consignment terms so you pay on draw-down rather than on delivery.

Related

Often bought alongside this.

Start here

Request a quotation

Voltage class, rating, quantity, applicable standards and required on-site date. We come back with a sourcing route, lead times and a budgetary number.